Retail
Wilmot Plaza
Complete revamp of the northeast corner of Broadway and Wilmot in Tucson, Arizona.
PROJECT DETAILS
Restaurant
Freddy’s Frozen Custard & Steakburgers
This ground-up 3,893 square foot, steel-stud shell building and tenant improvement included partition walls, glazing, doors, frames, electrical power and lighting, HVAC, restrooms, accessories and plumbing.
PROJECT DETAILS
Restaurant
Native Grill & Wings
This project involved new construction of a Tucson location for this award-winning chain known for its signature wings and vibrant atmosphere.
PROJECT DETAILS
Office
Annex Building
This project was a tenant improvement of a 100-year-old, 4-story building in downtown Tucson.
PROJECT DETAILS
Medical
Tucson Medical Center West Pavilion Campus Development and Parking Garage
In association with J.E. Dunn Construction, this work added upgraded surgery and patient care areas in the four-story Orthopedic and Surgical Tower, as well as a patient and visitor parking deck.
PROJECT DETAILS
Medical
TMC Wyatt Medical Office
This project involved exterior facelift of a 30-year-old building, with equipment upgrades and tenant improvements to a sizable medical facility.
PROJECT DETAILS
Solar
University of Arizona
This project involved a 1.6 MW single-axis power plant built for SOLON on 14 acres at the Solar Zone at the University of Arizona Science and Technology Park.
PROJECT DETAILS
Solar
Tucson Electric Power Tech Park 2
This project involved a 5MW fixed-array solar power plant built for SOLON on 25 acres at the Solar Zone at the University of Arizona Science and Technology Park.
PROJECT DETAILS
Solar
Tucson International Airport Solar Canopy
This project involved design and construction of the 1-megawatt photovoltaic, fixed-tilt array reaching 20 feet over the main hourly/daily public parking lot at the Tucson International Airport Terminal.
PROJECT DETAILS
Solar
SOLON Corporation Test Site
This project involved installation of SOLON Corporation's single- and dual-axis trackers at Tucson Electric Power's solar test field.
PROJECT DETAILS
Solar
Roger Road Wastewater Treatment Facility Solar Plant
This project involved construction of a 1-megawatt solar power plant at the Roger Road Sewer Treatment Plant.
PROJECT DETAILS
Solar
Black Mountain Solar
This project was a 10 MW single-axis power plant built on 56 acres in Golden Valley, Arizona.
PROJECT DETAILS
Solar
AstroSol Solar Power Plant
This project was a 6.1 MW fixed-array solar power plant for AstroSol, built on 38 acres at the Solar Zone at the University of Arizona Science and Technology Park.
PROJECT DETAILS
Retail
Sahuarita Plaza
This project included façade remodel and demolition of a former retail building, as well as tenant improvements for each of the three national tenants.
PROJECT DETAILS
Retail
QuikTrip
QuikTrip is a top-rated convenience/gasoline retail operation that focuses on key, high-volume locations across eleven states.
PROJECT DETAILS
Retail
Plaza Palomino
This project was a design-build effort to renovate the shopping center while ensuring that the businesses and offices remained open and customer access was maintained.
PROJECT DETAILS
Retail
Lazy Days
This RV park expansion, featured on local Tucson television commercials, included an exterior/civil/landscape package that transformed a parking lot into a camping facility.
PROJECT DETAILS
Retail
El Con Mall
After a demolition of the El Con Mall, projects ranged from renovation of a former department store to a new ground-up construction designed for restaurants and retail.
PROJECT DETAILS
Retail
Conn’s
This project involved multiple tenant improvements throughout Arizona for this nationwide chain of popular, big-box furniture, home décor and appliance stores.
PROJECT DETAILS
Restaurant
Zinburger
The Zinburger project involved remodeling an existing bistro restaurant and completely upgrading and changing the decor for an entirely new experience.
PROJECT DETAILS
Restaurant
Tilted Kilt
A 6,000 square foot restaurant tenant improvement for the Celtic-themed sports bar included custom millwork, granite countertops, new HVAC and new kitchen equipment.
PROJECT DETAILS
Restaurant
Smashburger
Barker Morrissey built all four of the Smashburger locations in Tucson and Oro Valley representing an ongoing partnership with the franchise.
PROJECT DETAILS
Restaurant
Pei Wei
This project was a new build for a Tucson location of Pei Wei, a popular Asian-inspired restaurant chain.
PROJECT DETAILS
Restaurant
Five Guys Burgers and Fries
These tenant improvements involved multiple Tucson locations for Five Guys Burgers and Fries.
PROJECT DETAILS
Restaurant
Blanco
The Blanco project was a remodel for a Sam Fox restaurant at La Encantada. The project included shell building modifications and constructing operable roll-up doors to allow for an indoor/outdoor dining experience.
PROJECT DETAILS
Restaurant
Beyond Bread
This Beyond Bread project modified an old Blockbuster retail space into a new Beyond Bread Bakery and Restaurant.
PROJECT DETAILS
Office
Texas Instruments
The Texas Instruments project completely renovated two 50,000 square foot call center office buildings into new office and lab space,and constructed an expandable 25,000 square foot lab building, including 11,000 square feet of a Class 1000 clean room.
PROJECT DETAILS
Office
Synchronoss Tech Call Center
This project was a carefully coordinated, fast-track project completed in phases so the owner could utilize available space to begin training in order to get the business operational as soon as possible.
PROJECT DETAILS
Office
Stantec
Stantec is a national consulting firm for engineering, architecture, environmental, project management and other services. BMC provided renovations to the Tucson location’s fourth floor space of approximately 13,688 square feet.
PROJECT DETAILS
Office
Oracle Office Building
BMC was general contractor for construction of a new 40,000 square foot, two-story office building.
PROJECT DETAILS
Office
Bellovin & Karnas
This renovation of a 60-year-old building included loft-style offices and colored concrete and original wood floors discovered during demolition.
PROJECT DETAILS
Medical
University Medical Center North MOHS Clinic
This negotiated contract project constructed a new 2,600 square foot clinic at the UMC North Cancer Center.
PROJECT DETAILS
Medical
Tucson Medical Center Obstetrix Clinic
This Tucson affiliate of Obstetrix Medical Group offers a full range of perinatal health services. The project involved an 8,770 square foot conversion of an existing hospital space to an obstetrics clinic.
PROJECT DETAILS
Medical
Square Compass Children’s Clinic
This project completely renovated the interior of a two-story building. The work was divided into four separate phases, as the facility remained open during construction.
PROJECT DETAILS
Medical
Northwest Eye Surgery Center
This ophthalmic outpatient surgery facility involved a 6,500 square foot addition, including approximately 1000 square feet of administration area.
PROJECT DETAILS
Medical
CSL Plasma
This series of CSL Plasma projects involve new, state-of-the-art blood plasma collection centers across the United States.
PROJECT DETAILS
Industrial
Wesco
The Tucson distribution center project for this national electrical supplies and construction materials company was a remodel of existing industrial space.
PROJECT DETAILS
Industrial
Solon America
This project was a remodel of a 104,000 square foot building for manufacturing, research and development and office space.
PROJECT DETAILS
Industrial
Sion Power
This 65,000 square foot research & design facility was a tenant improvement in an existing 104,000 square foot building.
PROJECT DETAILS
Industrial
Medical Systems Logistics
This project involved a 60,000 square foot ground-up tilt building.
PROJECT DETAILS
Industrial
Material Recovery Facility
This project included construction of a 60,000 square foot metal building, major site renovation, and relocation and coordination of all major public utilities for the City of Tucson to sort and process recycling materials.
PROJECT DETAILS
Industrial
Computer Designs
BMC was general contractor for the remodel of an 85,000 square foot building for office, warehouse, and manufacturing space for this custom thermoforming tool design company.
PROJECT DETAILS
Education
University of Phoenix
This renovation was for the Tucson location of the University of Phoenix, a nationwide network of colleges offering both campus and online courses.
PROJECT DETAILS
Education
Tucson College
The Tucson College project expanded and renovated approximately 30,000 square feet of existing office space into a new vocational college.
PROJECT DETAILS
Education
Digital Technology Academy
This two-story, 21,000 square foot steel frame structure with concrete masonry walls is home to a private school.
PROJECT DETAILS
Community
Santa Cruz Valley United Methodist Church
This project was a new build for Santa Cruz Valley Methodist, a new church located in the growing Sahuarita community twenty-five miles southwest of Tucson.
PROJECT DETAILS
Community
Our Saviour’s Lutheran Church
Founded in 1945, the church is adjacent to two historical districts. This project involved an activity center and sanctuary remodel for Tucson’s oldest Evangelical Lutheran church.
PROJECT DETAILS
Community
Green Valley Recreation Center
This project was a 10,000 square foot expansion of the existing Green Valley Las Campanas Recreation Center.
PROJECT DETAILS
Community
Desert Hills Lutheran Church
The Desert Hills Lutheran Church project remodeled and added approximately 13,000 square feet to an operating church.
PROJECT DETAILS
Education
Sonoran Science Academy
This project was a new build for the Sonoran Science Academy, a STEM-focused, college preparatory school serving approximately 850 students and faculty.
PROJECT DETAILS